Non-Typical Weekly spread using the Craft Planner by Cobbery

I have two bookcases in my office filled with planners and notebooks, which means I have a brilliant ‘archive’ of different planner layouts. Back in 2017 when I started this blog, I used to try a different weekly layout every week.

As the years went by and I figured out what I liked and didn’t like in a planner, I switched to using different planners every other week.

In the past few years I’ve gravitated more towards using my own printables (fast + easy when I’m lazy), relying on different checklists, drawing up simple bullet journal spreads or reverting back to my all time favorite planners.

I decided I needed to use some of the planners I’ve reviewed but haven’t tried yet and one of them is the Craft Planner by Cobbery. It was a kickstarter back in 2018 and is no longer sold. So why am I talking about this planner?

Because we’ve all seen the generic horizontal, vertical and nowadays dashboard weekly spread (not sad that the dashboard layout has become a ‘common’ layout now though!).

The Craft Planner has some structure, but it’s still a flexible layout. It’s also a layout that’s easy to recreate in any bullet journal notebook.

Learn more about the planner in this post: Review of The Craft Planner by Cobbery (Pros, Cons & Pen Testing)

Before the Pen

The planner doesn’t have a traditional weekly spread.

Instead, this planner is more of a project planner that you can flexibly use for weekly planning.

the craft planner cobbery undated alternative to bullet journal sewn bound graph paper gantt chart annual overview video review minimalist gender neutral_11

the craft planner cobbery undated alternative to bullet journal sewn bound graph paper gantt chart annual overview video review minimalist gender neutral_19

the craft planner cobbery undated alternative to bullet journal sewn bound graph paper gantt chart annual overview video review minimalist gender neutral_20

After the Pen

weekly planner with grid pages cobbery a5 notebook flexible planner custom categories no days of the week project planning planner for school

Love the layout. I work my day job Monday to Friday, I don’t have much time in the evenings on a weeknight so that time is mostly for life admin. I have more time to do things on the weekend so separate lists for Saturday and Sunday are helpful to make the most of those 2 days.

The boxes at the top are good for notes, reminders and since there is no daily sections, for putting in appointments. You could go further and do hydrate trackers, fruit and vegetable intake etc. I use a monthly habit tracker so don’t repeat those in my weekly spreads.

Related posts

I’m only using my planner for myself. I don’t have kids or anyone else’s schedules to keep track of. This type of spread works well if you don’t need large boxes for each day of the week like most planners have.

Sometimes I’ll do a timed schedule for Saturday and Sunday instead of just the checklists, but the things on my to do list this week were tasks that I wasn’t sure how long they would take, so I didn’t bother trying to do a schedule.

how to plan when you don't have much to plan using checklists instead of daily planner compact flexible planner for project planning busy people mom

This week was my first week back from my latest Europe trip. I shared the itinerary in this post.

project planner weekly spread grid paper checklists blog life admin weekend plan by category rather than by day minimalist simple fast easy

I’m not sure if it’s the combination of the Pilot G2 pens which I can write really fast with thanks to the comfort grip, or if it was the grid pages making it hard to see where I was writing. But my writing was even messier than usual this week. I was also avoiding using whiteout as the pages are more yellowish than white so if I’d used white out it would really stand out.

The paper in this planner is thin, my writing indented on the backside of the page.

cobbery weekly planner review simple minimalist diary agenda organizer kickstarter paper quality pen testing ghosting bleed through color coded

Tip: If you have a planner or notebook with thin paper, place a piece of printer paper underneath the page to absorb excess ink, so you don’t see the other side of the page when writing, and to reduce indenting. I secure the paper with a paperclip.

I didn’t do that when I tested out this planner as I wanted to see how the paper held up. If I use this planner again I’ll be adding the piece of paper underneath.

cobbery weekly planner review simple minimalist diary agenda organizer kickstarter paper quality pen testing ghosting bleed through

Supplies Used

I kept it extremely minimalist this week and only use the Pilot G2 pens and the Pilot Frixion erasable pens.

Related post: Paper Mate Inkjoy versus Pilot G2: Which gel pen is best?

non typical weekly planner spread color coded by day checklist weekend planner best planner when you don't have much to plan pilot g2 pens colorful

Would I use this planner again?

I probably won’t use the Craft Planner again for weekly planning as I don’t like how bold the grid is.

I do like this layout for a weekly spread, and have created similar iterations of it in my bullet journal over the years.

If you’re someone that doesn’t have much time on weekdays either, try a layout like this with larger sections for weekend planning – it really is helpful.

Past week spreads

More than 200+ past weekly spreads here.

Planning tips

50 tips for writing a better to do list free printable productivity time management how to set up a new planner paper planning goals

Tired of drawing up weekly spreads?  This printable bundle of 52 different 1 page weekly planners (you can mix and match to create 2 page spreads if you prefer), is available in my Etsy shop and online store. It comes in US letter size and Happy Planner classic page size.

weekly planner printable 1 page dashboard layout monday sunday start minimalist printable fillable pdf

Liked this post? Pin it!

craft planner by cobbery weekly spread non typical layout how to plan when you don't have much to plan compact grid paper color coded weekend planner tips inspo bullet journal

You’ll Also Love

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.